A revised plan for the development of 115 hectares of land along the northern and eastern shorelines of Centre Lake was presented to Highlands East council at a special meeting on Oct. 7.
The proposed development, northwest of Cardiff, includes 33 lots for seasonal cottages, including two island lots, and one block for commercial development abutting Highway 118.
According to planner Ritee Haider of Arcadis, the original application submitted in 2021 included the development of 28 seasonal cottages, along with a resort and wellness centre with 60 suites, and commercial uses along Highway 118. She said at that time the proposal included crown reserve and shoreline road allowance being transferred to the property owner, to create waterfront lots.
At a public meeting in 2021, residents voiced concerns about the loss of public land, shoreline and natural environment, as well as the scale of the proposed development.
The revised plan increases the number of seasonal cottages to 33 and removes the wellness centre and resort.
“Another key revision is that the Crown Reserve and municipal shore road allowance has not been included. The Crown Reserve is not part of this application,” said Haider. “So, Crown Lands will still be accessible to the public. It will still be able to be used by residents, cottagers and visitors for canoeing, fishing and quiet recreation.”
There is approximately 40 metres of crown reserves along the shoreline of Centre Lake, and a 20 metre road allowance.
Council heard from a number of residents regarding the revised plans for the development on Oct. 8. Those comments will be considered by staff.
A report will come back to council at a later date.

